The route - South of the river in Kent
Overview
- Section 1: Foreword
- Section 2: What is the Lower Thames Crossing?
- Section 3: The story so far
- Section 4: Why the Lower Thames Crossing is so important
- Section 5: The route - Design changes
- Section 5: The route - South of the river in Kent
- Section 5: The route - The crossing
- Section 5: The route - North of the river in Thurrock and Essex
- Section 6: Local communities, landscapes and the environment
- Section 7: Building the crossing
- Section 8: Using the Lower Thames Crossing
- Section 9: Consultation and development consent
- Section 10: How to have your say
- Section 11: Find out more
M2/A2 junction
The A2 will remain as four lanes in both directions with hard shoulders throughout. The M2 will be widened from three lanes to four in both directions through junction 1.
Two one-way link roads will be provided north and south of the A2, connecting to the existing A289 and the old A2 at the eastern end. Neither of these link roads will connect to the A2 at M2 junction 1, with these connections being made at the site of the new LTC junction instead.
The A2 will be kept at its existing height and the link roads will be at approximately the same height.
We will need to rebuild a section of the M2/A2 immediately to the west of the new junction and for approximately 2 miles (3.5km) to the east, including junction 1 of the M2.
The route will pass under Thong Lane and approach a new junction with the A2, situated at the eastern edge of Gravesend. The road will be in a cutting approaching the tunnel.
The following maps show the proposals for the section south of the river in Kent.
Have your say
To comment on the proposed route, answer questions 2, 3 and 4 in the response form. To comment on the proposed route south of the crossing, answer question 3a and 3b in the response form.
M2/A2 junction connections
(Click on an arrow below the map to view all the maps)
M2/A2 junction images
Existing M2/A2 and Proposed M2/A2
(Swipe across to compare image)
Existing Thong Lane and Proposed Thong Lane
(Swipe across to compare image)
Exisitng A2 and Proposed M2/A2/LTC
(Swipe across to compare image)
Continue to the next section: Section 5: The route - The crossing
Read more
- Section 1: Foreword
- Section 2: What is the Lower Thames Crossing?
- Section 3: The story so far
- Section 4: Why the Lower Thames Crossing is so important
- Section 5: The route - Design changes
- Section 5: The route - South of the river in Kent
- Section 5: The route - The crossing
- Section 5: The route - North of the river in Thurrock and Essex
- Section 6: Local communities, landscapes and the environment
- Section 7: Building the crossing
- Section 8: Using the Lower Thames Crossing
- Section 9: Consultation and development consent
- Section 10: How to have your say
- Section 11: Events and further information
Audiences
- Anyone from any background
Interests
- Roads