A5/M42 junction 10 Options Consultation
Overview
Investing in your roads
At National Highways we believe in a connected country and our network makes these connections happen. We strive to improve our major roads and motorways, engineering the future to keep people moving today and moving better tomorrow. We want to make sure all our major roads are more dependable, durable and, most importantly, safe.

We are consulting on proposed improvements to the A5/M42 junction 10. This page provides information about the proposals and explains how to take part. Your feedback will help inform the ongoing development of the scheme.
Join the Conversation
Why is the scheme needed?
The junction sits at a key location on the Strategic Road Network (SRN). It forms a vital interchange between the A5 corridor and the wider motorway network, linking the Midlands to major routes including the M40, M42, M5 to the south and the M1 to the north. This makes it important for both long-distance and local journeys, providing access to key employment sites and growth areas.
The junction experiences congestion, delays and a high number of collisions. With further development planned nearby, traffic is expected to increase, making improvements to capacity, safety and access essential.

Our proposed improvements aim to improve journey time reliability and network resilience, enhance safety and support economic growth in the region.
How is this project being developed
The A5/M42 junction 10 scheme is a Road Investment Strategy 3 (RIS3) pipeline project. Pipeline projects are schemes that National Highways will develop during the third road period (2026 - 2031) in preparation for potential construction in the following road period, beyond 2031.
The A5/M42 junction 10 is one of nine major enhancement schemes identified in the RIS3 pipeline. As the project progresses, it will be subject to further development and assessment to ensure it aligns with National Highways objectives and wider government priorities, and that it represents value for money, is affordable and can be delivered successfully.
Being part of the pipeline does not guarantee construction.
Any future decision to proceed will be informed by the evidence gathered during project development, including feedback received through this consultation, alongside business case assessments and government investment decisions.
Why your views matter
This consultation will help inform the selection of a preferred option for the scheme. It will also guide elements of the detailed design for the selected option. At this stage, we are seeking your views on what matters most to you, and what factors you believe should be considered in selecting the preferred option.
Your comments will help us better understand the local area and any potential impacts our scheme may have on you, local businesses, and the community. We’ll listen to and consider all feedback received as we further refine our proposals after this consultation.
We’d like to hear what you think, so please share any concerns, ideas or local knowledge you may have. The consultation will run from Monday 2 November to 11.59pm on Friday 11 December 2026, and there are many ways to tell us what you think. Why not come along to one of our options consultation exhibitions?
Join the Conversation
We’d like to hear what you think, so please share any ideas, local knowledge, or concerns that you may have about our proposals by responding to our consultation using this form.
Although our online response form is the most effective and efficient way to submit your feedback, we recognise that some people may prefer to respond in other ways. Alternative methods for responding to the consultation are outlined below.
- Hard-copy: complete a consultation response form (available at our events, at local venues or on request) and return it by post to: FREEPOST A5/M42 JUNCTION 10 (no stamp required).
- In person: complete a copy of our printed response form and give it to a member of staff at one of our consultation events.
Options consultation exhibitions
One of the best ways to find out more about our proposals and have your say is to come to one of our options consultation exhibitions. Here you’ll be able to find out more about the scheme, view our consultation materials and speak to members of the project team, who will be happy to answer any questions you may have. We’ll be holding consultation events at the following locations, dates and times:
| Date and Time | Location | |
| Event 1 | Saturday 21 November - 10am - 4pm | Dordon Village Hall, Browns Lane, Dordon, Tamworth, B78 1TL |
| Event 2 | Thursday 26 November - 2pm - 8pm | Tamworth Assembly Rooms, Corporation Street, Tamworth, B79 7DN |
Visit our Engagement Van
Our engagement van and team will also be available to talk through the scheme and answer questions at the following locations, dates and times:
| Date | Time | Location |
| Tuesday 3 November | 2pm - 7pm | Asda, Ventura Retail Park, Tamworth, B78 3HB |
| Saturday 14 November | 9am - 4pm | Tamworth Market, St Editha's Square, B79 7LS |
Consultation documents
Before completing the questionnaire, we encourage you to review our consultation materials to help you understand the proposals and their potential impacts.
The following documents are available to download:
A5/M42 J10 Consultation Brochure
A5/M42 J10 Consultation Response Form
A5/M42 Junction 10 Non Technical Environmental Assessment
These documents provide information about the A5/M42 junction 10 scheme, the options being consulted on and how feedback received during this consultation will be used.
Your feedback at this stage will help inform the selection of a preferred option for the A5/M42 junction 10 scheme. Please ensure your response is submitted by 11.59pm on 11 December 2026. Responses received after this deadline may not be considered.
Deposit Points
Hard copies of the consultation brochure and response forms will be available at the following local venues from Monday 2 November 2026 (availability will depend on opening times):
| Venue | Address |
| Tamworth Information Centre | Borough Council, Marmion House, Lichfield Street, Tamworth, B79 7BZ |
| Glascote Library | 80 Caledonian, Tamworth, B77 2ED |
| Polesworth Library and Information Centre | Bridge Street, Polesworth, Tamworth, B78 1DT |
| Atherstone Library | Long Street, Atherstone, CV9 1AX |
| Dordon Library | Roman Way, Dordon, Tamworth, B78 1RD |
Requesting printed or accessible formats
You can also request a paper copy of the consultation brochure and response form free of charge by contacting us on the contact details set out below and providing your postal address. A copying charge may be applied for requests for large quantities of documents or for printed copies of our other consultation materials.
Consultation materials can be made available in alternative formats, such as translations into other languages, large print or Braille, on request. For requests, please contact us using the contact details outlined below.
How to contact us
You can get in touch with us in the following ways:
- By phone: Call our Customer Contact Centre on 0300 123 5000 to speak to an adviser or request a call back from the project team
- By email: A5M42junction10@nationalhighways.co.uk
When contacting us, please include the reference ‘A5/M42 junction 10 Consultation’ to help us direct and track your enquiry.
What happens next?
Following the close of the consultation at 11.59pm on 11 December 2026, we will carefully review all responses received and consider the feedback alongside our ongoing technical, environmental and design assessments. We will use this information to refine the options where possible and ensure that potential impacts on local communities and the environment have been fully considered.
The findings from the consultation will be analysed and reported in a summary consultation report, which will explain the feedback received and how it has influenced the project. This summary report will be published within 12 weeks of the consultation closing. A full consultation report will be published when a preferred option is announced and will be available to view on the project website.
As the project develops, we will undertake further design work and environmental assessments, including identifying additional measures that could help reduce environmental impacts. We will also determine the appropriate consenting route required to deliver the preferred option, which is similar to obtaining planning permission for this type of infrastructure project.
If we receive approval from the Department for Transport to proceed to Stage 3 Preliminary Design, we will announce a preferred option (via a Preferred Route Announcement). If the scheme were to be approved for the next stage of design, there may be further opportunities to have your say.
How investment decisions are made
Decisions about whether the A5/M42 junction 10 scheme ultimately receives funding will be made following a detailed assessment of its benefits, costs and deliverability. The strategic objectives set out by the Department for Transport (DfT) as part of RIS3 are as follows:
- Grow the economy
- Improve safety for all
- Deliver a level of network performance that meets customers’ needs
- Deliver a technology enabled and enabling network
- Ensure a resilient network that is planned and managed for the long term
- Deliver improved environmental outcomes
All of these and other factors will be considered to help us select a preferred option. The feedback we receive as part of this consultation will inform decision making and future design considerations. The final decision on whether to deliver the scheme is made by the DfT based on the assessment work carried out by National Highways.