A5 Gibbet Hill Options Consultation - National Highways - Citizen Space
Overview
Investing in your roads
At National Highways we connect people and places across the country. We improve major roads and motorways to keep people moving now and in the future. We want to make sure all our major roads are more reliable, durable, and most importantly, safe.

We are consulting on proposed improvements to the A5 Gibbet Hill junction. This page provides information about the proposals and explains how you can take part. Your feedback will help us to continue to develop the scheme.
Why is the project needed?
The A5 Gibbet Hill roundabout is a known congestion location on our road network. It regularly experiences long queues, on all main approaches.
Congestion is expected to worsen due to major planned developments including Magna Park, Daventry International Rail Freight Terminal, and housing growth in Rugby and Lutterworth. These pressures are expected to increase traffic levels and delays.

We know how important reliable and safe journeys are for everyone who uses the A5. That’s why we’re looking at ways to improve how traffic moves through the Gibbet Hill junction, reduce delays and make everyday travel safer and more predictable.
The junction is part of a key freight corridor in the UK. It serves both long-distance and local traffic journeys and acts as a diversion route for the M1 and M6.
The roundabout causes congestion through nearby villages like Shawell, transferring problems to local roads. Journey time reliability is poor due to high traffic volumes and slow-moving vehicles. Other issues include overrunning on verges, poor pedestrian access near the services, and restricted visibility on two arms of the roundabout.
Our proposed improvements aim to improve journey time reliability and network resilience for strategic traffic, enhance safety and support economic growth in the region.
How is this project being developed
The A5 Gibbet Hill scheme is a Road Investment Strategy 3 (RIS3) pipeline project. Pipeline projects are schemes that National Highways will develop during the third road period (2026 - 2031) in preparation for potential construction in the following road period, beyond 2031.
The A5 Gibbet Hill is one of nine major enhancement schemes identified in the RIS3 pipeline. As the project progresses, it will be subject to further development and assessment to ensure it aligns with National Highways objectives and wider government priorities, and that it represents value for money, is affordable and can be delivered successfully.
Being part of the pipeline does not guarantee construction.
Any future decision to proceed will be informed by the evidence gathered during project development, including feedback received through this consultation, alongside business case assessments and government investment decisions.
Why your views matter
This consultation will help inform the selection of a preferred option for the scheme. It will also guide elements of the detailed design for the selected option. At this stage, we are seeking your views on what matters most to you, and what factors you believe should be considered in selecting the preferred option.
Your comments will help us better understand the local area and any potential impacts our scheme may have on you, local businesses, and the community. We’ll listen to and consider all feedback received as we further refine our proposals after this consultation.
Find out more and have your say
We’d like to hear what you think, so please share any concerns, ideas or local knowledge you may have. The consultation will run from Wednesday 23 September to Tuesday 3 November, and there are many ways to tell us what you think. Why not come along to one of our public consultation exhibitions?
Have Your Say
Although our online response form is the most effective and efficient way to submit your feedback, we recognise that some people may prefer to respond in other ways. Alternative methods for responding to the consultation are outlined below.
- Hard-copy: complete a consultation response form (available at our events, at local venues or on request) and return it by post to: FREEPOST A5 GIBBET HILL (no stamp required).
- In person: complete a copy of our printed feedback form and give it to a member of staff at one of our consultation events.
Public consultation exhibitions
One of the best ways to find out more about our proposals and have your say is to come to one of our public consultation exhibitions. Here you’ll be able to find out more about the project, view our consultation materials, and speak to members of the project team, who will be happy to answer any questions you may have. We’ll be holding consultation events at the following locations, dates and times:
Event 1
Wednesday 7 October 2026
Holiday Inn Rugby, Crick, Northampton, Northamptonshire, NN6 7XR
2pm - 8pm
Event 2
Saturday 17 October 2026
Cotesbach Village Hall, Main Street, Cotesbach, Leistershire, LE17 4HZ
10am - 4pm
Consultation documents
Before completing the questionnaire, we encourage you to review our consultation materials to help you understand the proposals and their potential impacts.
The following consultation documents are available to download using the links below or by accessing the Related documents section at the bottom of this page:
These documents provide further information about the A5 Gibbet Hill scheme, the options being consulted on, and how feedback received during the consultation will be considered and used to inform the next stages of the scheme.
These documents provide further information about the A5 Gibbet Hill scheme, the options being consulted on, and how feedback received during the consultation will be considered and used to inform the next stages of the scheme.
These documents provide information about the A5 Gibbet Hill scheme, the options being consulted on, and how feedback received during this consultation will be used.
Your feedback at this stage will help inform the selection of a preferred option for the A5 Gibbet Hill scheme. Please ensure your response is submitted by 11.59pm on Tuesday 3 November 2026. Responses received after this deadline may not be considered.
Deposit Points
Hard copies of the consultation brochure and response forms will be available at the following local venues from Wednesday 23 September (availability will depend on opening times):
| Venue | Address |
|---|---|
| Rugby Library and Information Centre | Little Elborow Street, Rugby, CV21 3BZ. |
| Lutterworth Library | George Street, Lutterworth, LE17 4ED. |
| Lutterworth Leisure Centre | Coventry Road, Lutterworth, LE17 4RB. |
| Magna Park Lutterworth | The Estate Office, Harrier Parkway, Magna Park, Lutterworth, LE17 4XT. |
Requesting printed or accessible formats
You can also request a paper copy of the consultation brochure and response form free of charge by contacting us on the contact details set out below and providing your postal address. A copying charge may be applied for requests for large quantities of documents or for printed copies of our other consultation materials.
Consultation materials can be made available in alternative formats, such as translations into other languages, large print or Braille, on request. For requests, please contact us using the contact details outlined below.
How to contact us
You can get in touch with us in the following ways:
- By phone: Call our Customer Contact Centre on 0300 123 5000 to speak to an advisor or request a call back from the project team
- By email: A5GibbetHill@nationalhighways.co.uk
When contacting us, please include the reference ‘A5 Gibbet Hill Consultation’ to help us direct and track your enquiry.
What happens next?
Following the close of the consultation on Tuesday 3 November 2026, we will carefully review all responses received and consider the feedback alongside our ongoing technical, environmental and design assessments. We will use this information to refine the options where possible and ensure that potential impacts on local communities and the environment have been fully considered.
The findings from the consultation will be analysed and reported in a summary consultation report, which will explain the feedback received and how it has influenced the project. This summary report will be published within 12 weeks of the consultation closing. A full consultation report will be published when a preferred option is announced and will be available to view on the project website.
As the project develops, we will undertake further design work and environmental assessments, including identifying additional measures that could help reduce environmental impacts. We will also determine the appropriate consenting route required to deliver the preferred option, which is similar to obtaining planning permission for this type of infrastructure project.
If we receive approval from the Department for Transport to proceed to Stage 3 Preliminary Design, we will announce a preferred option (via a Preferred Route Announcement). If the scheme were to be approved for the next stage of design, there may be further opportunities to have your say.
How investment decisions are made
Decisions about whether the A5 Gibbet Hill scheme ultimately receives funding will be made following a detailed assessment of its benefits, costs and deliverability. The strategic objectives set out by the Department for Transport (DfT) as part of RIS3 are as follows:
- Grow the economy
- Improve safety for all
- Deliver a level of network performance that meets customers’ needs
- Deliver a technology enabled and enabling network
- Ensure a resilient network that is planned and managed for the long term
- Deliver improved environmental outcomes
All of these and other factors will be considered to help us select a preferred option. The feedback we receive as part of this consultation will inform decision making and future design considerations. The final decision on whether to deliver the scheme is made by the DfT based on the assessment work carried out by National Highways.
Audiences
- Anyone from any background
Interests
- Roads
Share